hotel wastewater treatment

Client: Beltra Hotel

Project: Supply of packaged 300PE wastewater treatment system

Additional Information: An existing wastewater treatment plant onsite was not achieving the deign effluent standards due to high strength wastewater from the hotel and shock loadings to the plant from events at the hotel [weddings, etc]. The client needed to install a system which was guaranteed to meet the stringent effluent targets set for the site. The design engineers recommended Biocell due to our track record in providing cost effective, high quality solutions that always meet the required effluent standards,

Delivered on time and on budget.

Search